Hard leaner with a lot of top

This was a hard leaner with a lot of top.  The home owner had taken down seven or eight 60 to 80 footers but this one was serious.  It had two major branches over the pole building and although the base was 10′ from the building, by the time you got to 30′ it was even with it.  The good news was at about 40′ it straightened out.  To get the leverage I had to go to within 15 feet of the tip top.  Put a rope and used a come-long to improve the directional odds to 99%.  That’s the goal before I pull the trigger.  The video is not very good but you can see what’s going on and the music is kind of funny.

About timbento

I believe that, " ...all things work together for the good to those who love God, to those who are the called according to His Purpose." Romans 8:28
This entry was posted in Job of the Day. Bookmark the permalink.

Comments are closed.